Builder Name:Matt Jakus   -  
Project:   The Airplane Factory - Sling TSi   -   VIEW REPORTS
Total Hours:1190.7
Start/Last Date:Dec 01, 2019 - Jan 29, 2023
Engine:Rotax 915is
Panel:Garmin 3X
 
Friendly URL: https://eaabuilderslog.org?s=MattJ

Home or Last Project Picture

Aug 16, 2021     Finish Brake System - (4 hours)       Category: Landing Gear
After putting in the Throttle/Brake quadrant I filled an leak checked the brakes. I had to make a small mod on the threaded portion of the piston to allow full freedom of movement. There was not enough movement to allow the piston to the full extension and I was concerned there may be pressure to the brakes which could result in dragging.

A 1/4 inch was removed and full freedom was noted. Brakes were set and checked next day for leaks.


 